Vzduchotechnik s.r.o.

Biomass-boiler room with an output of 1000 kW

  • Years of realization: 2020-2021

  • Location: Liberec Region, Czech Republic

  • Type of service: Electrical installation

About

In 2021, we had the honor to participate on the reconstruction of the cultural monument of the boiler house from 1905. The boiler house is located in Andělská hora, Chrastava and is part of a production area in Art Nouveau style with elements of Dutch architecture, which was built during the years 1904-1907.

Our company provided the high-current and low-current electrical installations as an important part of the modification of the existing boiler room to a new biomass boiler room with output of 1000 kW.

In 2021, the whole boiler room project won the Karel Hubáček Award in the jury award category. Several Czech high-tech companies are currently located in this area.

Other projects

Schneider Electric

During the project we have replaced the hardware on a photovoltaic power plant station with an output of 100 kWp.

NAFIGATE Park s.r.o.

Strong current and weak current – modification of an existing object with purpose of creating new production premises.

Vzduchotechnik s.r.o.

Strong current and weak current – reconstruction of the cultural monument of the boiler house from 1905.

MP Technical Group s.r.o.
Andělohorská 419
463 31 Chrastava
Tel.: +420 734 160 801
Email: obchod@mptechnical.cz

> PHOTOVOLTAIC POWER PLANTS

> INDUSTRIAL AUTOMATION

> ELECTRICAL INSTALLATION

> SHOP